Transmission Lines

11 minutes ago
5 min read

Data centers are top of mind for many Northern Virginians, but a new aspect of their infrastructure is becoming a concern for locals – and for some of our conserved properties.  Transmission lines are required to transfer electricity from power sources to data centers. Newly proposed transmission line sites have mobilized citizens concerned about the environmental effects of construction, among other things, particularly regarding the Valley North Transmission Line. The plan is for this line to stretch 115 feet from Campbell County down to Culpeper County. This is a joint effort from Dominion Energy, FirstEnergy Transmission LLC, and Transource Energy LLC. In Northern Virginia, more than 50 transmission line sites are proposed, mostly concentrated in Ashburn and along the stretch of data centers between Bull Run and Manassas.

 

Concerns about these transmission lines center on forestland removal, ongoing disturbance from their presence, and degradation of the environments they’re placed in.  Clear-cut paths for above-ground transmission lines often bisect existing habitat, fragmenting it and disrupting the ecosystem. Most wildlife rarely cross gaps, especially smaller wildlife. These animals are adapted to canopy cover to hide from predators or use camouflage to prey on others; an open landscape is unfamiliar and not what they are used to. Larger herbivores and predators like coyotes or deer cross transmission line gaps easily; however, the lack of cover still makes deer vulnerable and has the opposite effect on predators. In other parts of the country, wolves and coyotes have been recorded using these corridors as highways to move quickly while hunting prey, which could disrupt predator-prey dynamics by increasing predator-prey encounters. For avian species, flying into lines is a common threat in areas with these lines. The U.S. Forest Service estimates that in the United States, transmission line collisions account for up to 175 million avian deaths annually. Vegetation is not spared from destruction; surrounding trees and large plants are pruned or treated with herbicide to prevent line interference and removed from the path these transmission lines follow. This disturbance also invites invasive plants to move in and outcompete native plants.  


 

Active engagement from Northern Virginians on this issue centers on environmental impacts, but there are also a multitude of human impacts. For farmers, the concern is that pesticides and herbicides used to keep vegetation away will leak into the soil and spread to their crops and graze for livestock. For others, these obstructions take away from the scenic beauty of Northern Virginia’s natural areas.

Valley Link Transmission LLC was formed this past June, and responses from citizens to the proposal of the Valley Link Transmission Line began soon after. Citizens of Loudoun County held meetings and attended city council hearings to voice their opposition. Continued citizen engagement resulted in the Loudoun County Board of Supervisors passing a resolution officially opposing the Valley North Transmission Line project and denying a related substation near Dulles Airport this past September. Two proposed Loudoun County routes were dropped in October, and this November Valley North will host several public open houses to present refined route alternatives in Loudoun County.

 

Along with local pushback on transmission line proposals, Northern Virginia's lawmakers have done significant legislative and regulatory work to lessen and mitigate the environmental damage caused by large-scale transmission line projects.  At the beginning of the year, House Bill 1491 was introduced, proposing that the State Corporation Commission (SCC), when considering the approval of transmission lines that are more powerful than 136 kV, try to the greatest extent possible to keep the lines over 500 feet away from schools, residential properties, daycares, parks, playgrounds, recreational areas, or places of worship. This bill passed after amendments were made and went into effect in July 2026. While HB 1491 represents a step toward better considering the impacts of transmission line development, legislative protections for homes and public spaces do not necessarily address concerns about forestland, wildlife habitat, conservation easements, and permanently protected properties.

 

As Northern Virginia’s regional land trust, we have two avenues to protect nature from being removed for any type of development. The first is the basis of our work: land protection through conservation easements. The second is advocacy and policy work with partners and coalitions. Conservation easements are the most proactive and actionable step we use to safeguard nature. For this reason, we were alarmed to hear that two of our conserved properties are slated to have the Valley North Transmission Line pass through them. We immediately contacted landowners and partners to comment and use our voice to advocate for NVCT landowners. Our comment is below:

 

“NVCT has opposed the proposed Valley North Transmission Line routes, not only because of the potential effect on the surrounding environment but also because they intersect with two of our permanently conserved conservation easement properties. Construction of a new transmission line across these protected parcels would directly compromise the ecological integrity, scenic character, and long-term conservation benefits these lands provide. Landowners voluntarily placed these easements with the understanding that the properties would remain safeguarded from precisely this type of disruptive development. Allowing the Valley North project to proceed through these easements would undermine not only the conservation commitments made by NVCT and the landowners, but also the public trust placed in our organization to uphold these protections.


We understand the growing need for transmission lines in our region to support increasing demand for power. However, we strongly urge Valley Link to seek alternative routes, utilize existing corridors, and avoid impacts to permanently conserved lands.”

As stated in our message, we understand the need for transmission infrastructure in a growing area like Northern Virginia. We also understand the unique constraints presented by a region with such varied densities and continual demand for development.  These challenges underscore the importance of keeping habitat intact and avoiding greenfield development, especially on parcels that have environmental protections.  Given the direct effect on properties under NVCT’s protection, we urgently suggest reconsidering the proposed site entirely because of the permanent conservation easement on the land.  Our conservation easements represent lasting commitments made by landowners to protect the natural, scenic, and ecological value of their properties for generations to come. When these agreements are made, the intention is for NVCT and the landowners to work together to steward the land, and for it to remain protected in perpetuity; that agreement should be respected and upheld.

 

As transmission line proposals continue to move forward across Northern Virginia, NVCT will continue to monitor projects that could affect protected properties and the surrounding natural environment. We believe that meeting the region's growing energy needs should go hand in hand with responsible land-use planning.

 

 
 
 

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
NVCT_Symbol_Color.png

4022-A Hummer Road

Annandale, VA 22003

703-354-5093

info@nvct.org

​

© 2026

Northern Virginia Conservation Trust is a 501(c)(3) non-profit organization.

​

EIN: 54-1724626

LTAC_seal_green_Excellence-hi rez.jpg
bottom of page